Rijalulhaqqi Hamidi
Group 7 ITB Thematic KKN with the theme of the construction of a hydram pump for the agricultural irrigation of the Embung Geyongan. The result of the program that has been implemented is the realization of water flow to the reservoir through the hydram pump system mentioned above. The hydram pump drainage system consists of the construction of a sedative, the installation of a hydram pump, and the holding of the pipe from the pump to the reservoir. The drainage of the water, in addition to the main reservoir (reservoir of geyongan), is also channeled to a small reservoir that is passed by the pipeline. The expectation of the realization of this water flow is to prevent the drought of the reservoir during the dry season and maximize the harvest of farmers by ensuring the availability of water for the rice fields is fulfilled. The companion program carried out by group 7 is the manufacture of a guidebook on hydram pumps, improving the quality of education through the education program Clean water and sanitation, maghrib reciting the Koran, ngabring with Sakola. And the last companion program is climate change mitigation.