Toolkit on Public Private Partnerships (PPP) for water management
Researcher Name (Team Leader)

Muhammad Syahril Badri Kusuma



Activity Summary

& nbsp; PPM activities in Sei Line up in the top down category, because it is a follow -up activity of PPM Previously, one of the results of the activity was the development of a reservoir for the supply of clean water that has been utilized not only by residents the village but also the surrounding village. The success of developing a water system This is clean, the following is also the development of educational activities up to the level Upper middle (SKM) and also Islamic -based schools, have received attention is not only from the community, local and central government, but also From international institutions, one of which is UNESCO. In this case, UNESCO has ask for the experience of developing a reservoir for this raw water supply system Socialized in the form of the tool kit following the UNESCO format. In the process preparation, the team has made a presentation at the request/invitation of UNESCO on International Water Forum Event online/online (PPT/poster attached). As a support, through this PPM Topdown this has also been updated about The latest conditions of the water supply system, to see the current performance And in the era of dating. Identification is done through long distance communication and also visit/field visit. During the field visit, observations were made Visual at the location of the reservoir and the existing raw water distribution system, as well as discussion With the village head of Steps, the manager (BUMDes) and DTR (Medco Energy). From the current top down activities, it can be concluded that the availability of water on The current reservoir, in quantity and quality is still above its capacity it is needed villagers who must be served at this time, however 3 the month stopped serving due to damage to the main pipeline network that had not yet been can be fixed. The improvement cannot be done because it is hampered financing problems that cannot be met because there is no agreement between the community/citizens of the user and the BUMDes in terms of management of this clean water distribution system. It should also be underlined that for the future, identified the need for an increase the capacity of the clean water supply system is due to the potential and The village area development plan becomes an eco -tourism mangrove area, capture fisheries and education. Indications for the potential development of activities in the region it can also be seen by having been connected by the road from BERA uke of the village.



Target

Build a reservoir for the supply of clean water that can be utilized not only by the villagers but also the surrounding village



Testimonials

For KK/Fak/ITB is a vehicle for the application of science and technology developed through research on campus as well as obtaining input for improvement of future research, a vehicle for students to be included in practicing theories/knowledge gained in class/lectures in field work, vehicles for contributions lecturers/ITB to ease the burden of development of Indonesia as a country, as well as participating in supporting both on a national scale and global fulfillment of SDGS20