visioning Master PIan Berbasis Partisipasi Publik di wilayah rerdampak
Gempa di Kabupaten Lombok Utara, Provinsi Nusa Tenggara Barat
Researcher Name (Team Leader)

Woerjantari Kartidjo



Activity Summary

The earthquake disaster in Lombok in July 2018 The number of victims plus experienced infrastructure damage which number is not a few housing buildings, highways, educational facilities for health facilities and means of worship. The slow process of rehabilitation and reconstruction of disaster affected regions is caused by the absence of institutional models that can encourage synergy between various handled interests. There have been several proposals for the design of the area submitted to residents, both from land consolidation consultants and from the developer. However, residents refused due to lack of understanding of the changes to be carried out. It turned out that there was an error perception received by residents on the socialization carried out before the implementation of PM was carried out. Hamlet residents only understand that they will be replaced with their land. The purpose of this service is, compiling the Visioning Master Plan based on PUB participation] as a functioning spatial device that functions and references in the implementation of the land consolidation strategy as an initial revitalization device (rehabilitation and recontusia), specializing device structuring devices and product setup products produced. The method used is a qualitative approach based on the affected areas. The results of this service are, more to the process of preparing the conceptual parent plan based on public participation and residents of Montong Hamlet are more open to discuss the development of the area while visited. Keywords: North Lombok, earthquake disaster, rehabilitation and construction victims.



Target

How much artwork / design / architecture / regional planning, the application of writing, the implementation of social care activities in the form of education / counseling / assistance, disaster emergency handling



Testimonials

As mentioned earlier, the problems faced more on Technical constraints in the field, before the development of the conceptual plan of the region. Community's dependence causes the time needed for development Design for quite a long time. In addition, another problem faced by partners is implementation of plans, because Burnin is enough funds that can be used in infrastructure development, as well as the right or adequate building design guide for Build a house to live local residents. It was feared that residents built his house Without sufficient knowledge, and still can't stand the disaster. With existing obstacles, it is expected that there is an advanced program that can complete the problem in the existing field is fast, since the community has long lived In refugee camps and want to reset in a living house that is habitable. Other than that, It is also expected that there is also follow-up from the government or partner for searches; RN investors In the development or implementation of draft results.